ILIJAN POWER PLANT PDF

Project name: Ilijan Power Plant (Kepco Ilijan Corporation), Project id: Country: Philippines, Location: Province of Batangas, Batangas. Financial Closure. Ilijan CCGT Power Plant Philippines is located at Ilijan, Batangas City, Philippines. Location coordinates are: Latitude= , Longitude. Type: Gas Power Plant; Area: Luzon, Batangas; Kind of Fuel: Natural Gas; Origin of Fuel: Malampaya Gas Field; Power Capacity: 1, MW (6.

Author: Kazrasho Mizshura
Country: Jordan
Language: English (Spanish)
Genre: Business
Published (Last): 4 July 2013
Pages: 332
PDF File Size: 2.27 Mb
ePub File Size: 3.29 Mb
ISBN: 203-2-92633-827-6
Downloads: 52680
Price: Free* [*Free Regsitration Required]
Uploader: Kigat

First G series turbine outside Japan. San Lorenzo power plant started using liquid fuel gas oil, naptha, condensate for testing and commissioning by late Inside the combustion chamber, the flame temperature of G combustors is between 2,F and 2,F.

Power Gas Markets

The plant is located at Sta. Those figures are remarkable, considering the remoteness of the project and the extensive infrastructure that had to be built to support it see table. In the G combustor, the basket and transition are known as the combustor swirler assembly and combustor liner, respectively.

The plant is rated at 1, MW net on the high-voltage side of the main transformers. REOL ilijjan the construction phase. To find out more, including how to control cookies, see here: It was literally carved out of the Philippine jungle by an international consortium of developers, engineers, and contractors.

The plant also share common facilities being used by the Sta.

The Ilijan power plant consists of two blocks, each comprising of two gas turbine generators, and one steam turbine generator. This air is supplied as the cooling and sealing air for the turbine disks and rotating blades after being externally cooled and filtered.

The Mitsubishi G series gas turbines Figure 3 operate with a turbine inlet temperature of 2,F and use steam to cool their combustor liners. Rita power plant to the Calaca substation. Each gas turbine generator has a nominal expected gross rated output of MW and MW for each of the turbine generators. The plant was operated on liquid fuel gas oil, naptha, condensate until the end of Liquid fuel was used as back-up fuel thereafter.

TOP Related Articles  WASLALA GIOCONDA BELLI PDF

First G series turbine outside Japan The Mitsubishi G series gas turbines Figure 3 operate with a turbine inlet temperature of 2,F and use steam to cool their combustor liners. The G gas turbine uses steam taken from the bottoming cycle for cooling the combustor liner.

Notify me of new comments via email. Entries and comments feeds. The blade passage temperature and mechanical vibration of all four GTs were maintained within satisfactory levels.

Rita plant such as the tank farm and fuel jetty, thus reducing the need to duplicate various operational facilities.

The 1,MW Ilijan combined-cycle plant is truly a greenfield powsr.

Ilijan, Batangas Powerplant

Fill in your details below or click an icon to log in: During natural gas firing, one operates while the other two remain on standby. In addition, the site was often visited by heavy storms and typhoons that slowed construction plxnt delayed the delivery of equipment and materials. Intermediate steam and primary superheater outlet steam serve as ilujan backup for GT combustor transition piece cooling and are pwer to the hot reheat steam.

Obstacles overcome Two very significant obstacles had to be overcome to complete the project. The DLN combustor in the MHI G gas turbines consists of a pilot nozzle, eight main fuel nozzles, air bypass valves, and a double-wall structure for basket and transitions.

You are commenting using your Twitter account. Each unit is composed ilijsn a gas turbine, a steam turbine generator connected to a common shaft and the corresponding heat recovery steam generator. Rotor cooling air is provided with compressor discharge air extracted from the combustor shell.

TOP Related Articles  CIANOSIS CENTRAL Y PERIFERICA PDF

This is the first G placed into commercial service outside Japan. You are commenting using your WordPress. The plant cannot operate in simple-cycle mode ppower it has no bypass stack. The plant also includes a transmission line which interconnects the Sta.

The plant, which is designed to be dispatched Figure 2 and to operate at or near full load, consists of two MW nominal power blocks. San Miguel Energy Corporation who was declared as the highest bidder last 16 April won the administration of the 1, MW Ilijan.

Seawater is used for condenser cooling water. The water treatment system provides a i,ijan supply of the high-quality demin water required for plant makeup, gas turbine water injection for NOx control, and dilution water for chemical feed systems.

Two very significant obstacles had to be overcome to complete the project.

Kepco Philippines

But for Ilijan, the end justified the means. This site uses cookies. Commercial operations using natural gas as the primary fuel commenced on January 1, p,ant From there, the gas is transported through a in-diameter onshore pipeline running 9 miles to the plant.

Email required Address never made public. MCMirant Corp. In the mids, the Philippine government decided to develop the Camago-Malampaya gas fields in the Province of Palawan to foster growth of the economy of Southern Luzon.

Commercial operation was in October 1, By continuing to use this website, you agree to their use. You are commenting using your Facebook account.